Calamity

πŸ‡ΊπŸ‡Έ United States Risk Assessment

Max CFI Score

47

elevated

Risk Rating

D

score 68.0

Operational Status

red

The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.

Risk Assessment by Hazard Type

HazardScoreLevel
flood47elevated
river flood46elevated
earthquake45elevated
fire45elevated
weather42elevated
volcano35moderate
air quality31moderate
tsunami31moderate
cyclone30moderate
disease24moderate
drought17low