π¨π³ China Risk Assessment
Max CFI Score
65
highRisk Rating
C
score 50.0
Operational Status
yellow
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| flood | 65 | high |
| cyclone | 51 | elevated |
| fire | 46 | elevated |
| weather | 45 | elevated |
| earthquake | 38 | moderate |
| air quality | 31 | moderate |
| drought | 13 | low |
| asteroid | 9 | low |