π¨π¬ Congo Risk Assessment
Max CFI Score
45
elevatedRisk Rating
C
score 54.0
Operational Status
1 of 2 hazard scores on this page have not been recomputed for more than 30 days β the oldest 69. A seven-day outlook that old describes a week that has passed. Each score is recomputed from the events recorded for that hazard in this country, so a score stops moving when the hazard stops being reported here: measured on 2026-09-01, all 192 stale scores in the archive had zero events of their own hazard in the previous thirty days, against 6 of 465 among the scores that are current. We publish them rather than hide them, and we say how old they are.
The CFI estimates risk for the next 7 days based on historical frequency, seasonal patterns, and current activity. The Risk Rating reflects the current situation. A high CFI with a low rating means risk is building but has not yet materialized.
Risk Assessment by Hazard Type
| Hazard | Score | Level |
|---|---|---|
| fire | 45 | elevated |
| drought | 17 | low |